10.7 C
New York
Wednesday, November 20, 2024

Hell froze over in Texas – the state will hook up with the US grid for the primary time through a fed grant


The US Division of Vitality (DOE) declares $1.5B for 4 transmission initiatives – together with connecting the Texas grid to the remainder of the US for the primary time ever.

The initiatives, spanning a number of states, will add practically 1,000 miles of recent transmission strains and improve grid capability by 7,100 megawatts (MW). They’ll enhance grid reliability, decrease power prices, and help the clear power transition.

The initiatives will enhance transmission congestion and resilience, particularly because the nation faces extra excessive climate occasions. By bettering connections between areas and making it simpler to entry renewable power sources like wind and photo voltaic, these initiatives will make power extra dependable and cost-effective. They’ll additionally generate practically 9,000 jobs, supporting native economies in Louisiana, Maine, Mississippi, New Mexico, Oklahoma, and Texas.

Along with the transmission initiatives, the DOE launched its Nationwide Transmission Planning Examine, which outlines a long-term imaginative and prescient for assembly future power wants via 2050. The examine highlights the necessity to double or triple transmission capability from 2020 ranges to make sure reliability and resilience because the power panorama shifts towards renewables. Right here’s a breakdown of the 4 initiatives:

By Bouchecl – Personal work, CC BY-SA 3.0, https://commons.wikimedia.org/w/index.php?curid=6750405
  • Aroostook Renewable Mission (Maine): This 111-mile transmission line with a capability of 1,200 MW will join a brand new substation in Haynesville, Maine, to the bigger New England grid, offering entry to scrub power from northern Maine. It’s anticipated to create over 4,200 building jobs and 30 everlasting jobs.
  • Cimarron Hyperlink (Oklahoma): A 400-mile HVDC line will run from Texas County to Tulsa, shifting 1,900 MW of unpolluted wind and solar energy to rising load facilities in japanese Oklahoma and elsewhere within the Southwest Energy Pool. This venture will create 3,600 building jobs and 20 everlasting roles.
  • Southern Spirit (Texas to Mississippi): This can be a REALLY. BIG. DEAL. Spanning 320 miles, this HVDC line will hyperlink Texas’ remoted ERCOT grid with the Southeast grids for the primary time, including 3,000 MW of bidirectional capability throughout Texas, Louisiana, and Mississippi. It’s designed to stop outages like those throughout Winter Storm Uri that hit Texas onerous in 2021. It’s anticipated to create 850 building jobs and 305 everlasting jobs.
  • Southline (New Mexico): A 108-mile transmission line will present 1,000 MW of recent bidirectional capability between Hidalgo County and Las Cruces. It’s going to assist meet power wants of industries investing within the area, together with semiconductor, battery manufacturing, and knowledge middle services. The venture will create no less than 150 building jobs.

US Deputy Secretary of Vitality David Turk mentioned, “DOE’s method to deploying near-term options and creating long-term planning instruments will guarantee our electrical grid is extra interconnected and resilient than ever earlier than, whereas additionally supporting larger electrical energy demand.” 

Learn extra: How EVs had been a lifeline for 3 households (and 6 cats) throughout the Texas blackout

FTC: We use revenue incomes auto affiliate hyperlinks. Extra.

Related Articles

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Latest Articles